St. James

Basking Ridge, NJ

hemmler + camayd architects was hired to renovate the existing church into a parish center and to design a new church, which is seamlessly connected to the existing structure both physically and in architectural expression. The worship space is approximately 19,000 SF, total parish office space slightly exceeds 3,000 SF, and the total organizational, meeting, and social space is approximately 16,000 SF. The lower level of the facility accommodates additional educational and social spaces.

Services included existing conditions evaluations, comprehensive architectural services, interior design, construction observation, and landscape design.

Construction Cost: $7,000,000
Completed: 1999